Task Decomposition
Weak runs start editing in the first minute and discover the real shape of the task by breaking things. Strong runs spend the first 10–20% of the task front-loading understanding, commit to a sequence, and change the sequence the moment reality contradicts it.
1. Restate the goal as an acceptance check
One or two sentences plus the exact command or observation that proves it: "Done means npm test -- export passes and the CSV opens with headers." Run that check once now. Expected result: it fails or does not exist yet. If it already passes, the task is misunderstood; reread the request. If the request is genuinely ambiguous on a decision the user owns, ask ONE batched set of questions now, not a drip mid-task. Ambiguity you can resolve from the code is yours to resolve.
2. Read the terrain before planning the route
Before proposing steps:
- Read the project instructions (CLAUDE.md, AGENTS.md) for constraints that override defaults.
- Open every file you expect to edit, plus one caller or consumer of each. Blast radius is defined by callers, not by the file you were pointed at.
- Find the last similar change (
git log, the newest analog in the tree) and plan to imitate it, not invent.
3. Write the step list, dependency-ordered
3–8 concrete steps, each independently verifiable, ordered so the build stays green as long as possible: types and schemas, then implementations, then call sites, then UI. For each step write the files touched and the command that verifies it. "Verify" without a command is not a step.
More than 8 steps means the task is two tasks; split it into phases and finish one before starting the next. Track the list visibly (todo list) for 3+ steps; mark exactly one step in progress at a time, and run its verification before marking it done.
4. Identify the risky step and de-risk it first
One step usually carries the real uncertainty: the unfamiliar API, the migration, the concurrency. Probe THAT step first with a spike, a dry run, or a one-file prototype, before investing in the safe steps. Discovering step 5 is impossible after finishing steps 1–4 is the expensive failure.
5. Re-plan on surprise, don't push through
When reality contradicts the plan (an API doesn't exist, a test reveals hidden coupling, a file is generated, a second attempt at the same step fails), STOP editing. Rewrite the plan explicitly: what changed, which steps die, which are added. Pushing the original plan through contradicting evidence produces half-finished hybrid states. If the surprise changes the scope the user asked for, surface it with options instead of silently redefining the task.
6. Keep a ledger on long tasks
For work spanning many steps or likely to hit context limits: maintain a short scratchpad file with goal, decisions made and why, steps done, steps remaining, current blockers. Update it at each milestone.
Exit condition
The task is done when the step list is empty AND the acceptance check from step 1 passes, run again after the last edit and pasted into the report. Verified, not assumed.