/deploy-checklist
If you see unfamiliar placeholders or need to check which tools are connected, see CONNECTORS.md.
Generate a pre-deployment checklist to verify readiness before shipping.
Usage
/deploy-checklist $ARGUMENTS
Output
markdown## Deploy Checklist: [Service/Release] **Date:** [Date] | **Deployer:** [Name] ### Pre-Deploy - [ ] All tests passing in CI - [ ] Code reviewed and approved - [ ] No known critical bugs in release - [ ] Database migrations tested (if applicable) - [ ] Feature flags configured (if applicable) - [ ] Rollback plan documented - [ ] On-call team notified ### Deploy - [ ] Deploy to staging and verify - [ ] Run smoke tests - [ ] Deploy to production (canary if available) - [ ] Monitor error rates and latency for 15 min - [ ] Verify key user flows ### Post-Deploy - [ ] Confirm metrics are nominal - [ ] Update release notes / changelog - [ ] Notify stakeholders - [ ] Close related tickets ### Rollback Triggers - Error rate exceeds [X]% - P50 latency exceeds [X]ms - [Critical user flow] fails
Customization
Tell me about your deploy and I'll customize the checklist:
- "We use feature flags" → adds flag verification steps
- "This includes a database migration" → adds migration-specific checks
- "This is a breaking API change" → adds consumer notification steps
If Connectors Available
If ~~source control is connected:
- Pull the release diff and list of changes
- Verify all PRs are approved and merged
If ~~CI/CD is connected:
- Check build and test status automatically
- Verify pipeline is green before deploy
If ~~monitoring is connected:
- Pre-fill rollback trigger thresholds from current baselines
- Set up post-deploy metric watch
Tips
- Run before every deploy — Even routine ones. Checklists prevent "I forgot to..."
- Customize once, reuse — Tell me your stack and I'll remember your deploy process.
- Include rollback criteria — Decide when to roll back before you deploy, not during.

