Migration Readiness Assessment
Step 1: Gather context
Ask the user:
What workload are you planning to migrate? Please share:
- Workload name and code packages/directories to analyze
- Current environment (on-premises, other cloud, colocation)
- Business drivers (cost, agility, compliance, end-of-life hardware, etc.)
- Timeline constraints (optional)
If context is already provided or you are in a codebase, proceed directly.
Step 2: Application Stack Discovery
Analyze the codebase to understand the current application stack.
You MUST examine:
- Programming languages and runtimes (versions, compatibility with AWS services)
- Frameworks and libraries (web frameworks, ORM, messaging)
- Database technologies (relational, NoSQL, search, caching)
- Middleware and message brokers
- External service dependencies (APIs, SaaS integrations)
- Configuration management (config files, environment variables, secrets)
- Operating system dependencies and system-level requirements
- Build and packaging systems (Maven, npm, pip, Docker)
For each component, document:
- File path and line numbers
- Technology and version
- AWS equivalent or migration path
- Migration complexity (simple lift, requires changes, requires rewrite)
- Dependencies on other components
You MUST flag as BLOCKER:
- OS-specific dependencies without cloud equivalents
- Proprietary software with licensing restrictions (Oracle, specific Windows features)
- Hardware-specific dependencies (FPGA, specific CPU instructions, USB dongles)
- Hardcoded IP addresses or hostnames in application code
- Local filesystem dependencies (shared network drives, local storage)
Step 3: Infrastructure Discovery
Analyze existing infrastructure configurations.
You MUST examine:
- Server configurations (CPU, memory, storage requirements)
- Network topology (VLANs, firewalls, load balancers, DNS)
- Storage systems (SAN, NAS, local disk, file shares)
- Database configurations (engine, version, size, replication)
- Monitoring and alerting systems
- Backup and DR configurations
- Security controls (firewalls, IDS/IPS, WAF, certificates)
- Existing IaC if any (Terraform, Ansible, Chef, Puppet)
For each infrastructure component, document:
- Current configuration
- AWS equivalent service
- Migration approach (rehost, replatform, refactor)
- Data volume and transfer considerations
Step 4: Dependency Mapping
Map all internal and external dependencies.
You MUST examine:
- Service-to-service communication (protocols, ports, patterns)
- Database connections (connection strings, pooling, multiple consumers)
- Shared databases or data stores (multiple services writing/reading)
- External API integrations (third-party services, partner APIs)
- Network dependencies (latency-sensitive connections, VPN tunnels)
- Batch job dependencies (scheduling, order of execution)
- Authentication/authorization dependencies (LDAP, AD, SSO)
You MUST create a dependency diagram showing:
- All services and their connections
- Data flows and protocols
- External dependencies
- Migration wave groupings (what must move together)
You MUST flag as HIGH RISK:
- Tight coupling between components that must move together (increases blast radius)
- Shared databases accessed by multiple services (migration ordering constraint)
- Latency-sensitive integrations that will span hybrid during migration
- Hard dependencies on on-premises systems that cannot move (require hybrid connectivity)
---STOP--- Checkpoint: Discovery and dependency mapping complete — ready to determine migration strategy
Mapped the application stack ({X} components), infrastructure configurations, and dependency relationships. Identified {Y} blockers, {Z} high-risk dependencies (shared databases, latency-sensitive integrations), and migration wave groupings.
Shall I proceed with determining the migration strategy (7 Rs) for each component and assessing readiness by pillar?
Do NOT proceed past this point until the user explicitly confirms.
Step 5: Determine migration strategy (7 Rs)
For each component, evaluate which strategy fits based on code evidence:
| Strategy | When to use | Code Indicators |
|---|---|---|
| Rehost | Fast migration, minimal changes | Standard OS, containerizable, no OS-specific deps |
| Replatform | Small optimizations during move | Self-managed DB → RDS, self-managed cache → ElastiCache |
| Refactor | Need cloud-native benefits | Monolith that should be decomposed, stateful → stateless |
| Repurchase | Replace with SaaS | Commercial software with AWS/SaaS equivalent |
| Retire | No longer needed | Unused code, deprecated services |
| Retain | Not ready to move | Hard dependencies, compliance blockers |
| Relocate | VMware workloads | VMware-specific configurations |
You MUST justify each recommendation with code evidence.
Step 6: Assess readiness by pillar
For each pillar, provide: Readiness (Ready/Conditionally Ready/Not Ready), Evidence (file:line), Gaps, Actions needed.
Operational Excellence Readiness
- Is there IaC? (CloudFormation, Terraform, CDK, Ansible)
- Are CI/CD pipelines in place? Can they target AWS?
- Is monitoring portable or tied to specific tools?
- Are operational procedures documented?
Security Readiness
- Are there compliance requirements affecting region/service choice?
- How are secrets managed? (hardcoded, vault, config files)
- Are there network security dependencies needing equivalents?
- Is identity management compatible with AWS IAM/Identity Center?
Reliability Readiness
- What is the current availability? What's the target?
- Are there HA mechanisms to replicate?
- What's the acceptable downtime during migration?
- Are backup/recovery procedures tested?
Performance Efficiency Readiness
- Are there latency-sensitive integrations?
- Are there hardware-specific dependencies?
- What are current performance baselines?
- Are there SLAs to maintain during cutover?
Cost Optimization Readiness
- What's the current TCO? (hardware, licensing, ops, facilities)
- Are there licensing implications? (BYOL, license-included, re-purchase)
- Are there existing contracts or prepaid commitments?
Sustainability Readiness
- Can migration reduce resource footprint?
- Are there opportunities for Graviton/serverless?
- Can managed services replace self-managed infrastructure?
Step 7: Risk Assessment
For each risk, assess using Impact × Likelihood:
Impact: Minor (schedule slip, minor rework) | Moderate (significant rework, extended hybrid period) | Severe (migration failure, data loss, extended outage)
Likelihood: Low (unlikely with proper planning) | Medium (possible without specific mitigation) | High (likely given current state)
| Impact | Likelihood | Risk Level |
|---|---|---|
| Severe | High | Critical |
| Severe | Medium | High |
| Severe | Low | High |
| Moderate | High | High |
| Moderate | Medium | Medium |
| Moderate | Low | Medium |
| Minor | High | Medium |
| Minor | Medium | Low |
| Minor | Low | Low |
---STOP--- Checkpoint: Risk assessment complete — ready to produce the final migration assessment
Assessed {N} risks across the migration. Risk distribution: {X} Critical, {Y} High, {Z} Medium, {W} Low. Overall readiness: {Ready / Conditionally Ready / Not Ready}. Critical blockers and mitigations identified.
Shall I produce the full Migration Readiness assessment with migration plan and cost comparison?
Do NOT proceed past this point until the user explicitly confirms.
Step 8: Produce the assessment
markdown# Migration Readiness Assessment: {Workload Name} ## Executive Summary - **Date**: {date} - **Packages Analyzed**: {list} - **Recommended Strategy**: {primary strategy} - **Overall Readiness**: {Ready / Conditionally Ready / Not Ready} - **Estimated Effort**: {T-shirt size with justification} - **Key Risks**: {top 3} - **Critical Blockers**: {count and brief description} ## Application Stack Summary | Component | Technology | Version | AWS Equivalent | Strategy | Complexity | |-----------|-----------|---------|---------------|----------|------------| | {name} | {tech} | {ver} | {aws service} | {7R} | {Low/Med/High} | ## Dependency Map {PlantUML diagram showing service dependencies, data flows, and migration wave groupings} ## Readiness Scorecard | Pillar | Readiness | Score (1-5) | Key Blocker | Action Needed | |--------|-----------|-------------|-------------|---------------| | Operational Excellence | {status} | {score} | {blocker} | {action} | | Security | {status} | {score} | {blocker} | {action} | | Reliability | {status} | {score} | {blocker} | {action} | | Performance Efficiency | {status} | {score} | {blocker} | {action} | | Cost Optimization | {status} | {score} | {blocker} | {action} | | Sustainability | {status} | {score} | {blocker} | {action} | ## Critical Blockers {For each: ID, description, evidence (file:line), impact on migration, resolution approach, effort} ## Risks and Mitigations | Risk | Evidence | Risk Level | Migration Impact | Mitigation | AWS Service | |------|----------|------------|-----------------|------------|-------------| | {risk} | {file:line} | {level} | {impact} | {mitigation} | {service} | ## Pre-Migration Checklist {Ordered by priority — what must be done before migration starts} - [ ] {action with evidence of why it's needed} ## Migration Plan ### Phase 1: Mobilize (Weeks 1-2) | Task | Dependencies | AWS Service | Evidence | |------|-------------|-------------|----------| {Landing zone, connectivity, tooling setup} ### Phase 2: Migrate (Weeks 3-6) | Wave | Components | Strategy | Data Volume | Downtime Window | |------|-----------|----------|-------------|-----------------| {Component migration waves based on dependency analysis} ### Phase 3: Optimize (Weeks 7-8) | Optimization | Component | Expected Benefit | AWS Service | |-------------|-----------|-----------------|-------------| {Right-sizing, managed services, serverless, Graviton} ## AWS Services for Migration | Category | Service | Purpose | Relevant Components | |----------|---------|---------|-------------------| | Server | AWS MGN | Rehost EC2 | {components} | | Database | AWS DMS | Replicate with minimal downtime | {components} | | Data | DataSync / Snowball | Large-scale transfer | {components} | | Schema | AWS SCT | Schema conversion | {components} | | Network | Direct Connect / VPN | Hybrid connectivity | {components} | | Governance | Control Tower | Multi-account | All | ## Cost Comparison | Category | Current (monthly est.) | AWS Estimated | Delta | Notes | |----------|----------------------|---------------|-------|-------| | Compute | {estimate} | {estimate} | {delta} | {basis} | | Storage | {estimate} | {estimate} | {delta} | {basis} | | Networking | {estimate} | {estimate} | {delta} | {basis} | | Licensing | {estimate} | {estimate} | {delta} | {basis} | | Operations | {estimate} | {estimate} | {delta} | {basis} | ## Next Steps {Top 5 concrete actions the team should take this week to prepare}
Step 9: Offer follow-up
After delivering the assessment, offer:
Would you like me to:
- Design the AWS landing zone architecture?
- Create a detailed data migration plan for a specific database?
- Estimate AWS costs in detail for specific components?
- Build a pre-migration testing strategy?
- Design the hybrid connectivity architecture?
- Create IaC for the target AWS architecture?
Calibration Guidance
- A workload already containerized with CI/CD and IaC is LARGELY READY — focus on AWS-specific optimizations and data migration planning
- Every blocker and risk MUST have code evidence — don't flag "licensing risk" without checking actual dependencies
- Migration strategy recommendations must be justified by code analysis (not assumptions)
- "Cannot Determine" is valid for runtime characteristics not visible in code (e.g., actual data volumes, network latency requirements)
- For shared databases, always flag the migration ordering constraint — this is the #1 cause of migration complexity
- Cost estimates from static analysis are rough — acknowledge uncertainty and recommend AWS Pricing Calculator for precision
- Acknowledge migration-ready aspects prominently (containerized, stateless, IaC already exists)