Factory Plan
Two jobs, in order: sharpen the idea (intake interview → BRIEF.md), then
break it into tasks (PLAN.md). The task list created here is the spine of
everything downstream — factory-tests attaches proof to each task,
factory-handoff compiles them into the loop document, factory-review
grades the build against them.
A loose idea handed straight to a coding loop doesn't get built — it gets interpreted, all night, by an agent that can't ask you anything. This stage exists so every ambiguity dies while it's still cheap.
Part 1 — Intake interview (stage 1)
Interview protocol (adapted from Matt Pocock's grilling technique):
- One question at a time. Multiple questions at once are bewildering. Wait for the answer before the next question.
- Every question comes with your recommended answer and one line on why. The user can accept in two words or push back.
- Facts are yours, decisions are theirs. If the answer is discoverable — in the existing codebase, package.json, a README — look it up instead of asking. Only genuine decisions go to the user.
- Plain language. No jargon without an in-sentence definition.
- Walk the design tree in dependency order. Settle what shapes everything else first: who it's for → what done looks like → what's explicitly out → platform/data realities → the risky unknowns.
Cover, at minimum:
- What are we building, in one sentence a 10-year-old would understand?
- Who uses it, and what do they walk away with?
- What does "done" look like — what would you do with it the morning it works? (This becomes the top-level acceptance test.)
- What is explicitly NOT in this version? (Scope creep is what kills overnight runs.)
- New project or existing codebase? (If existing: read it now — stack, test command, how it runs — and confirm your findings in one summary line.)
- Anything that touches the outside world? (Payments, logins, emails, other people's APIs — each one is a risk to flag, not a reason to stop.)
- What's the riskiest or least-clear part, in their view?
Stop when you can write the brief without guessing. Usually 6-12 questions.
Output: factory/BRIEF.md
markdown# Brief: <project name> date: <YYYY-MM-DD> ## What we're building <2-4 sentences, plain language> ## Who it's for and what they get ## Done looks like <the morning-it-works test, as concrete behavior> ## Not in this version ## Facts (discovered, not asked) <stack, commands, existing structure — with file paths> ## Decisions made <one line per interview decision — this is the record the loop can't reinterpret> ## Open risks
Read the brief back in 3-4 sentences and get an explicit yes before Part 2.
Part 2 — Break the brief into tasks (stage 2)
Rules for a task list a coding loop can actually execute:
- Each task is one loop pass: a coding agent should finish it, test it, and commit it in a single focused session. Too big → split. "Build the dashboard" is a stage; "show the list of saved items on the dashboard page" is a task.
- Each task names observable behavior, not code structure. "User can save an item and see it after refresh" — never "create ItemService class".
- Dependency order, staged. Stage A must produce something runnable, even if ugly. Every later stage keeps the app runnable. A loop that can always run the app can always verify itself.
- Walking skeleton first. Task 1 is always: the thinnest end-to-end slice that proves the stack works (one page, one action, one saved thing).
- Flag the risky tasks (
risk: high— external APIs, auth, payments, data migrations) so the handoff can order or gate them sensibly. - 6-20 tasks for a typical build. Fewer means tasks are too big; more means scope is too big for one overnight run — say so and propose cutting scope, not compressing tasks.
Output: factory/PLAN.md
markdown# Plan: <project name> brief: factory/BRIEF.md date: <YYYY-MM-DD> ## Stage A — <plain-language stage name> ### A1. <task title — observable behavior> - what: <1-3 sentences> - proves: <which part of "done looks like" this serves> - risk: low | medium | high (<why, if not low>) - acceptance criteria: _pending factory-tests_ ### A2. ... ## Stage B — ...
acceptance criteria: _pending factory-tests_ is a deliberate hole —
factory-tests fills it. There is no separate task-creation skill: plan
creates the tasks, tests make them provable.
Close out
- Walk the user through the plan in plain language — stages, what exists after each, which tasks are risky and why. One screen, not a wall.
- Update
factory/STATE.md→ stage 3, next action "define acceptance criteria with factory-tests". If factory/STATE.md doesn't exist (standalone use), create it first with a minimal version of the schema described in factory/SKILL.md. - Offer the two next moves: run
factory-testsnow (recommended), orfactory-explainfirst if they want to see the plan as a picture before committing to it.