Incremental Delivery
Never "write everything, then test everything" — that strategy converts N independent small bugs into one entangled debugging session at the end. Small verified steps beat large unverified strides even when the stride looks 20% faster; something always goes wrong.
Step 1: Order the units
- Dependency order: shared types/schemas → pure logic → I/O adapters → interfaces (API/CLI/UI) → integration glue. Consumers are written after the things they consume exist and are verified.
- Risk first within that order: the unfamiliar API, the format never parsed, the algorithm you're unsure of — prove it in isolation before the plan depends on it. If it fails, the plan changes while changing is cheap.
- Pattern before replication: building N similar things? Build ONE end-to-end, verify it, THEN replicate. A flaw in the pattern costs 1× to fix before replication and N× after.
Step 2: Checkpoint after every unit
- After each coherent unit, run the fastest available check: compile, import, unit test, or a smoke run. Never stack a second untested layer on a first.
- In a git repo, commit (or otherwise mark) each known-good point so revert has a target.
- If a unit balloons mid-way: split it, checkpoint the finished half. Do not power through to a distant checkpoint.
Step 3: Maintain the state note
On any task long enough to survive a session break (or that another model might resume), keep a running note — a scratch file or persistent todo — containing:
- Units done / units remaining (the ordered list, checked off).
- Decisions later units must honor: naming scheme, error envelope shape, ID types, field formats — recorded the moment they're made.
- Open questions and assumptions so far.
- The exact next action, written for a cold reader.
Consult the note BEFORE starting each new unit — your memory of a decision made 8 units ago has drifted; the note hasn't. Write it as if a different, colder model will resume from it, because one might.
Step 4: Propagate interface changes immediately
When unit 7 forces a change to unit 2's interface (renamed field, new parameter, changed return shape):
- Grep for EVERY consumer of the old interface — do not fix only the ones you remember.
- Propagate the change to all of them NOW, not "after finishing unit 7".
- Re-run the earlier units' checks. Deferred propagation is how half-renamed codebases happen.
Step 5: Final consistency sweep
After the last unit, one deliberate pass over the WHOLE deliverable:
- Same naming conventions from first file to last? (Early files follow the original plan; late files follow how the plan evolved — reconcile them.)
- Same error format / response envelope / logging shape everywhere?
- Do early sections still accurately describe what later sections actually do? Documents drift exactly like code.
- Re-read the ORIGINAL request one final time and check every stated requirement and process instruction against the finished whole — long tasks decay instructions silently.
Checklist per unit
- Consulted the state note before starting?
- Unit's own check run and passing?
- Any new cross-cutting decision recorded in the note?
- Any interface change propagated to ALL existing consumers and their checks re-run?
- State note updated (done list, next action)?
Worked example
Task: build a CLI tool with 5 subcommands reading a config, calling an API, and writing reports.
- Order: (1) config loader + types [everything consumes it], (2) API client for ONE endpoint —
riskiest, unfamiliar API — proven with a live smoke call, (3) first subcommand end-to-end
[the pattern], (4–6) remaining subcommands [replication], (7) shared
--help/error polish. - Checkpoint: after unit 2, the smoke call reveals the API paginates — recorded in the note: "all list endpoints must paginate; client returns iterators, not lists." Units 3–6 honor it; without the note, subcommand 5 (written hours later) would have returned truncated lists.
- Unit 4 renames a config field for clarity → grep finds 3 consumers (units 1, 3, and a test); all updated in the same edit session; unit-1 and unit-3 tests re-run green.
- Sweep: subcommands 3 and 6 formatted errors differently (evolved mid-task) — reconciled;
original request re-read; requirement "machine-readable
--jsonoutput" found present in units 3–5 but missing in 6 — fixed before delivery instead of shipped missing.
Done when
Every unit has passed its own check at its own checkpoint; all interface changes were propagated the moment they happened; the final consistency sweep is complete; the finished whole has been re-checked against the original request line by line; and the state note's "remaining" list is empty or every leftover item is explicitly reported as deferred.