Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning.

Übersicht

Herausgeberhoavdc
RepositoryCodexKit
Skill-Namecodexkit-risk-register
Sterne
27
Forks
12
Mitgelieferte Dateien
1
LizenzMIT
Links
  • Anweisungen in Markdown

    Eine SKILL.md-Datei, die das Modell bei Bedarf lädt. So werden nur dann Token verbraucht, wenn eine Anfrage tatsächlich dazu passt.

  • Funktioniert mit jedem LLM

    KI-Skills bestehen aus reinem Markdown, nicht aus anbieterspezifischem Code. Daher funktionieren sie mit GPT, Claude, Gemini, Grok oder einem lokalen Modell.

  • 1 mitgelieferte Dateien

    Skripte, Vorlagen und Referenzmaterial, die das Modell bei der Arbeit lesen kann. Die Dateien sind schreibgeschützt und werden niemals ausgeführt.

  • Open Source

    Von hoavdc auf GitHub veröffentlicht. Prüfen Sie den Quellinhalt vor der Installation.

Installation

Installieren Sie den KI-Skill Codexkit Risk Register in TypingMind, um ihn mit jedem LLM zu nutzen, oder fügen Sie ihn einem anderen Agenten hinzu, der SKILL.md lesen kann.

1

In TypingMind installieren

TypingMind installiert einen Skill direkt aus seinem GitHub-Ordner — liest SKILL.md, bündelt die Ressourcendateien und speichert das Ergebnis lokal.

  1. Öffnen Sie die App und gehen Sie zu Plugins → Skills.
  2. Wählen Sie „Von GitHub installieren“.
  3. Fügen Sie die unten angegebene URL des Skill-Ordners ein und bestätigen Sie.
    https://github.com/hoavdc/CodexKit/tree/main/skills/codexkit-risk-register
  4. Aktivieren Sie den Skill in jedem Chat, in dem er verfügbar sein soll.
Plugins → Skills → Skill anlegen → Über GitHub-URL. Fügen Sie dann die Ordner-URL ein und klicken Sie auf „Weiter“.
2

In einem anderen Agenten installieren

Jeder Agent, der das Agent-Skills-Format lesen kann, kann diesen Skill nutzen — kopieren Sie den Ordner in das Skill-Verzeichnis des jeweiligen Agenten.

Claude Code — .claude/skills
git clone --depth 1 https://github.com/hoavdc/CodexKit.git /tmp/CodexKit
mkdir -p .claude/skills
cp -r /tmp/CodexKit/skills/codexkit-risk-register .claude/skills/codexkit-risk-register
Starten Sie Claude Code nach dem Kopieren neu, damit der neue Skill erkannt wird.

In TypingMind verwenden

Aktivieren Sie Codexkit Risk Register in einem beliebigen Chat in TypingMind. Den Rest übernimmt das Modell. Name und Beschreibung des Skills stehen im System-Prompt. Sobald eine Anfrage passt, lädt das Modell selbstständig die vollständigen Anweisungen — Sie müssen den Skill nie manuell aufrufen, und er verbraucht erst Token, wenn er tatsächlich genutzt wird.

Das Modell lädt Codexkit Risk Register automatisch, sobald eine passende Anfrage gestellt wird.

Funktioniert mit jedem KI-Modell

KI-Skills bestehen aus reinen Markdown-Anweisungen statt aus anbieterspezifischem Code. Daher ist Codexkit Risk Register nicht an das Modell gebunden, für das der Skill geschrieben wurde. Installieren Sie ihn einmal in TypingMind und nutzen Sie ihn mit GPT-5, Claude, Gemini, Grok, DeepSeek, Mistral, Llama oder einem selbst betriebenen lokalen Modell — alles mit Ihren eigenen API-Keys.

  • Wird nur bei Bedarf geladen

    Der System-Prompt enthält nur den Namen und die Beschreibung. Die Anweisungen werden bei der ersten passenden Anfrage geladen. Ein ungenutzter Skill verursacht daher keine Kosten.

  • Modell im laufenden Chat wechseln

    Da der Skill aus Anweisungen statt aus Code besteht, funktioniert er auch nach einem Modellwechsel — das nächste Modell liest dieselbe SKILL.md-Datei.

Skill-Anweisungen

Dies ist der Inhalt von SKILL.md, den das Modell lädt. Lesen Sie ihn vor der Installation — ein Skill besteht aus Anweisungen, denen Ihr Modell folgt.

Risk Register Manager

Purpose

Systematically identify, assess, and manage project risks using a structured register with probability/impact scoring and defined response strategies.

When to use

  • project kick-off to establish the initial risk baseline
  • sprint or milestone reviews to update and add emerging risks
  • before major decisions to assess risk exposure
  • when stakeholders request a risk assessment report

When not to use

  • live incident response or post-mortem analysis
  • security vulnerability scanning (use security tools)
  • personal task risk assessment

Inputs

  • project scope, objectives, and constraints
  • project type (predictive / adaptive / hybrid)
  • stakeholder list and their risk tolerance
  • known assumptions and dependencies
  • lessons learned from similar projects (if available)

Procedure

  1. Identify risks using multiple sources:
    • Internal: technical complexity, resource gaps, schedule pressure, budget
    • External: market shifts, regulatory changes, vendor reliability, geopolitical
    • PMBOK 8 emphasis: sustainability risks (ESG, climate, social impact)
    • Techniques: brainstorming, PESTLE analysis, Risk Breakdown Structure (RBS)
  2. Assess each risk qualitatively:
    • Probability: Very Low (0.1) / Low (0.3) / Medium (0.5) / High (0.7) / Very High (0.9)
    • Impact: Very Low (0.05) / Low (0.1) / Medium (0.2) / High (0.4) / Very High (0.8)
    • Risk Score = Probability × Impact
    • Red zone (≥ 0.25): immediate response required
    • Yellow zone: response plan needed
    • Green zone: monitor only
  3. Define response strategy:
    • For threats: Avoid / Transfer / Mitigate / Accept (active or passive)
    • For opportunities: Exploit / Share / Enhance / Accept
  4. Assign ownership — every risk has one named owner.
  5. Track residual risk — after response, re-score to verify reduction.
  6. SAFe integration — for SAFe teams, use ROAM board:
    • R = Resolved | O = Owned | A = Accepted | M = Mitigated

Output

  • risk register table: ID | Category | Description | Trigger | Probability | Impact | Score | Owner | Response Strategy | Residual Risk | Status
  • risk heat map summary (red/yellow/green distribution)
  • top 10 risks with detailed response plans
  • escalation list for sponsor or steering committee
  • risk trend over time (risk burn-down if tracked across sprints)

Definition of done

  • every identified risk has a probability, impact, and score
  • every red/yellow risk has a named owner and defined response strategy
  • residual risk is assessed for all mitigated risks
  • register is reviewable by stakeholders

Examples

  • "Build an initial risk register for a 6-month ERP migration project."
  • "Update the risk register after Sprint 5 — add 3 new risks we discovered."
  • "We have 15 risks but no response plans. Help me define strategies for the top 10."

Quality Criteria

  • All dependencies and prerequisites are documented
  • Changes are reversible or include a rollback plan
  • Security implications are assessed for each configuration change
  • Monitoring and alerting are defined for post-deployment validation

Verification (4C)

CheckQuestion
CorrectnessAre all configurations, permissions, and dependencies accurate?
CompletenessDoes the setup cover dev, staging, and prod environments as needed?
Context-fitIs the solution proportional to the problem (not over/under-engineered)?
ConsequenceIf deployed as-is to production, what is the highest-risk failure mode?

Edge Cases

  • Target environment has pre-existing configuration — Scan for conflicts before applying changes. Document what to preserve.
  • Permissions differ between environments — Test in staging first. Document the minimum permissions required.
  • Third-party service is unavailable or deprecated — Document fallback or alternative. Include health-check endpoints.

Changelog

  • v1.0.0 — Initial release

Mitgelieferte Dateien

Das Modell liest diese Dateien bei Bedarf, während der Skill geladen ist. Sie werden als lesbare Dateien bereitgestellt und niemals ausgeführt.

Häufig gestellte Fragen

Was macht der KI-Skill Codexkit Risk Register?

Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning.

Warum Codexkit Risk Register in TypingMind nutzen?

Weil Sie den Skill einmal installieren und mit jedem Modell verwenden können. Codexkit Risk Register besteht aus reinem Markdown statt aus anbieterspezifischem Code. So funktioniert derselbe Skill mit GPT-5, Claude, Gemini, Grok oder einem lokalen Modell – und Sie können das Modell mitten im Chat wechseln, ohne dass der Skill seine Funktion verliert. TypingMind verwendet Ihre eigenen API-Schlüssel. Sie bezahlen die Anbieter daher direkt statt über ein Abonnement pro Nutzerplatz, und Ihre Skills und Chats bleiben in Ihrem eigenen Speicher.

Wie installiere ich Codexkit Risk Register in TypingMind?

Öffnen Sie in TypingMind Plugins → Skills → Von GitHub installieren und fügen Sie https://github.com/hoavdc/CodexKit/tree/main/skills/codexkit-risk-register ein. TypingMind liest die Datei SKILL.md, bündelt die zugehörigen Dateien und installiert alles als Skill, den Sie für jeden Chat einzeln aktivieren können.

Welche KI-Modelle können Codexkit Risk Register nutzen?

Jedes Modell, das Sie in TypingMind verbinden. KI-Skills bestehen aus reinen Markdown-Anweisungen statt aus anbieterspezifischem Code. Daher können GPT, Claude, Gemini, Grok und lokale Modelle diesen Skill laden, wenn eine Anfrage dazu passt.

Wie viele KI-Modelle kann ich mit Codexkit Risk Register verwenden?

So viele Sie möchten. Solange ein Modell Skills unterstützt, können Sie Codexkit Risk Register damit verwenden – GPT, Claude, Gemini, Grok, DeepSeek, Mistral, Llama und weitere – alles in TypingMind mit Ihren eigenen API-Schlüsseln.

Ist der KI-Skill Codexkit Risk Register kostenlos?

Ja. Der Skill wird von hoavdc auf GitHub unter der Lizenz MIT veröffentlicht. Sie bezahlen nur Ihren eigenen KI-Anbieter für die verwendeten Token.

Was sind KI-Skills?

Ein KI-Skill ist ein wiederverwendbares Anweisungspaket, das einem KI-Modell vermittelt, wie es eine bestimmte Aufgabe erledigt. Es folgt dem offenen Format Agent Skills: eine Datei namens SKILL.md mit einem Namen und einer Beschreibung sowie allen Skripten, Vorlagen oder Referenzdateien, die das Modell möglicherweise benötigt. Das Modell liest die Anweisungen nur, wenn Ihre Anfrage zum Skill passt. Ein installierter Skill verursacht daher erst Kosten, wenn er verwendet wird.

Wie unterscheiden sich KI-Skills von Plugins oder MCP-Servern?

Ein Plugin oder MCP-Server stellt einem Modell neue aufrufbare Tools bereit – Code, der auf einem System ausgeführt wird und ein Ergebnis zurückgibt. Ein KI-Skill vermittelt dem Modell stattdessen Wissen und Vorgehensweisen: wie es eine Aufgabe angeht, welche Schritte es befolgt und wie eine gute Ausgabe aussieht. Skills bestehen aus reinem Markdown und benötigen daher weder Server noch API-Schlüssel oder Laufzeitumgebung. Sie funktionieren mit jedem Modell.

Alle

Jetzt eigenen KI-Arbeitsbereich einrichten

Abonnieren Sie unseren Newsletter und erfahren Sie mehr über neue Funktionen und kommende Gewinnspiele 👇