Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning.

Descripción general

Editorhoavdc
RepositorioCodexKit
Nombre de la habilidadcodexkit-risk-register
Estrellas
27
Forks
12
Archivos incluidos
1
LicenciaMIT
Enlaces
  • Instrucciones en Markdown

    Un archivo SKILL.md que el modelo carga cuando lo necesita, de modo que solo consume tokens cuando una petición es realmente relevante.

  • Funciona con cualquier LLM

    Las habilidades de IA están en Markdown, no en código específico de un proveedor, por lo que funcionan con GPT, Claude, Gemini, Grok o un modelo local.

  • 1 archivos incluidos

    Scripts, plantillas y referencias que el modelo puede leer mientras trabaja. Los archivos son de solo lectura y nunca se ejecutan.

  • Código abierto

    Publicada por hoavdc en GitHub. Revisa el contenido original antes de instalarla.

Instalación

Instala la habilidad de IA Codexkit Risk Register en TypingMind para usarla con cualquier LLM, o añádela a otro agente que lea SKILL.md.

1

Instalar en TypingMind

TypingMind instala una habilidad directamente desde su carpeta de GitHub: lee SKILL.md, empaqueta los archivos de recursos y guarda el resultado localmente.

  1. Abre la aplicación y ve a Plugins → Habilidades.
  2. Elige «Instalar desde GitHub».
  3. Pega la URL de la carpeta de la habilidad que se muestra a continuación y confirma.
    https://github.com/hoavdc/CodexKit/tree/main/skills/codexkit-risk-register
  4. Activa la habilidad en cada chat en el que quieras tenerla disponible.
Plugins → Habilidades → Añadir habilidad → Desde URL de GitHub; después, pega la URL de la carpeta y pulsa Continuar.
2

Instalar en otro agente

Cualquier agente que lea el formato Agent Skills puede usar esta habilidad: copia la carpeta en el directorio de habilidades de ese agente.

Claude Code — .claude/skills
git clone --depth 1 https://github.com/hoavdc/CodexKit.git /tmp/CodexKit
mkdir -p .claude/skills
cp -r /tmp/CodexKit/skills/codexkit-risk-register .claude/skills/codexkit-risk-register
Reinicia Claude Code después de copiarla para que detecte la nueva habilidad.

Úsala en TypingMind

Activa Codexkit Risk Register en cualquier chat de TypingMind y el modelo se encargará del resto. Su nombre y descripción se incluyen en el prompt del sistema y, en cuanto una petición es relevante, el modelo carga las instrucciones completas por sí solo. No tienes que invocarla manualmente y no consume tokens hasta que se utiliza.

El modelo carga Codexkit Risk Register automáticamente en cuanto una petición es relevante para esa habilidad.

Funciona con cualquier modelo de IA

Las habilidades de IA son instrucciones en Markdown, no código específico de un proveedor, por lo que Codexkit Risk Register no está vinculada al modelo para el que se creó. Instálala una sola vez en TypingMind y úsala con GPT-5, Claude, Gemini, Grok, DeepSeek, Mistral, Llama o un modelo local que ejecutes tú, todo con tus propias claves API.

  • Se carga solo cuando se necesita

    El prompt del sistema solo incluye el nombre y la descripción. Las instrucciones se cargan con la primera petición relevante, por lo que una habilidad que no se usa no supone ningún coste.

  • Cambia de modelo durante el chat

    Como la habilidad contiene instrucciones y no código, cambiar de modelo no impide que funcione: el nuevo modelo lee el mismo archivo SKILL.md.

Instrucciones de la habilidad

Este es el contenido de SKILL.md que carga el modelo. Léelo antes de instalar la habilidad: contiene instrucciones que tu modelo seguirá.

Risk Register Manager

Purpose

Systematically identify, assess, and manage project risks using a structured register with probability/impact scoring and defined response strategies.

When to use

  • project kick-off to establish the initial risk baseline
  • sprint or milestone reviews to update and add emerging risks
  • before major decisions to assess risk exposure
  • when stakeholders request a risk assessment report

When not to use

  • live incident response or post-mortem analysis
  • security vulnerability scanning (use security tools)
  • personal task risk assessment

Inputs

  • project scope, objectives, and constraints
  • project type (predictive / adaptive / hybrid)
  • stakeholder list and their risk tolerance
  • known assumptions and dependencies
  • lessons learned from similar projects (if available)

Procedure

  1. Identify risks using multiple sources:
    • Internal: technical complexity, resource gaps, schedule pressure, budget
    • External: market shifts, regulatory changes, vendor reliability, geopolitical
    • PMBOK 8 emphasis: sustainability risks (ESG, climate, social impact)
    • Techniques: brainstorming, PESTLE analysis, Risk Breakdown Structure (RBS)
  2. Assess each risk qualitatively:
    • Probability: Very Low (0.1) / Low (0.3) / Medium (0.5) / High (0.7) / Very High (0.9)
    • Impact: Very Low (0.05) / Low (0.1) / Medium (0.2) / High (0.4) / Very High (0.8)
    • Risk Score = Probability × Impact
    • Red zone (≥ 0.25): immediate response required
    • Yellow zone: response plan needed
    • Green zone: monitor only
  3. Define response strategy:
    • For threats: Avoid / Transfer / Mitigate / Accept (active or passive)
    • For opportunities: Exploit / Share / Enhance / Accept
  4. Assign ownership — every risk has one named owner.
  5. Track residual risk — after response, re-score to verify reduction.
  6. SAFe integration — for SAFe teams, use ROAM board:
    • R = Resolved | O = Owned | A = Accepted | M = Mitigated

Output

  • risk register table: ID | Category | Description | Trigger | Probability | Impact | Score | Owner | Response Strategy | Residual Risk | Status
  • risk heat map summary (red/yellow/green distribution)
  • top 10 risks with detailed response plans
  • escalation list for sponsor or steering committee
  • risk trend over time (risk burn-down if tracked across sprints)

Definition of done

  • every identified risk has a probability, impact, and score
  • every red/yellow risk has a named owner and defined response strategy
  • residual risk is assessed for all mitigated risks
  • register is reviewable by stakeholders

Examples

  • "Build an initial risk register for a 6-month ERP migration project."
  • "Update the risk register after Sprint 5 — add 3 new risks we discovered."
  • "We have 15 risks but no response plans. Help me define strategies for the top 10."

Quality Criteria

  • All dependencies and prerequisites are documented
  • Changes are reversible or include a rollback plan
  • Security implications are assessed for each configuration change
  • Monitoring and alerting are defined for post-deployment validation

Verification (4C)

CheckQuestion
CorrectnessAre all configurations, permissions, and dependencies accurate?
CompletenessDoes the setup cover dev, staging, and prod environments as needed?
Context-fitIs the solution proportional to the problem (not over/under-engineered)?
ConsequenceIf deployed as-is to production, what is the highest-risk failure mode?

Edge Cases

  • Target environment has pre-existing configuration — Scan for conflicts before applying changes. Document what to preserve.
  • Permissions differ between environments — Test in staging first. Document the minimum permissions required.
  • Third-party service is unavailable or deprecated — Document fallback or alternative. Include health-check endpoints.

Changelog

  • v1.0.0 — Initial release

Archivos incluidos

El modelo los lee según los necesita mientras la habilidad está cargada. Se ofrecen como archivos de lectura y nunca se ejecutan.

Preguntas frecuentes

¿Qué hace la habilidad de IA Codexkit Risk Register?

Build and maintain a project Risk Register per PMBOK 8 Risk Performance Domain. Identify risks, assess probability and impact, define response strategies, and track residual risk. Use throughout the project lifecycle — not just at planning. Do not use for operational incident response or security vulnerability scanning.

¿Por qué usar Codexkit Risk Register en TypingMind?

Porque la instalas una vez y la usas con cualquier modelo. Codexkit Risk Register está escrita en Markdown, no en código específico de un proveedor, por lo que la misma habilidad funciona con GPT-5, Claude, Gemini, Grok o un modelo local, y puedes cambiar de modelo en mitad del chat sin que deje de funcionar. TypingMind utiliza tus propias claves API, de modo que pagas directamente a los proveedores en lugar de pagar una suscripción por puesto, y tus habilidades y chats permanecen en tu propio almacenamiento.

¿Cómo instalo Codexkit Risk Register en TypingMind?

Abre Plugins → Habilidades → Instalar desde GitHub en TypingMind y pega https://github.com/hoavdc/CodexKit/tree/main/skills/codexkit-risk-register. TypingMind lee su archivo SKILL.md, empaqueta sus archivos y la instala como una habilidad que puedes activar en cada chat.

¿Qué modelos de IA pueden usar Codexkit Risk Register?

Cualquier modelo que conectes en TypingMind. Las habilidades de IA son instrucciones en Markdown, no código específico de un proveedor, por lo que GPT, Claude, Gemini, Grok y los modelos locales pueden cargar esta habilidad cuando una solicitud se corresponda con ella.

¿Con cuántos modelos de IA puedo usar Codexkit Risk Register?

Con tantos como quieras. Siempre que un modelo admita habilidades, puedes usar Codexkit Risk Register con él: GPT, Claude, Gemini, Grok, DeepSeek, Mistral, Llama y muchos más, todos en TypingMind con tus propias claves API.

¿Es gratuita la habilidad de IA Codexkit Risk Register?

Sí. hoavdc la ha publicado en GitHub bajo la licencia MIT. Solo pagas a tu proveedor de IA por los tokens que utilizas.

¿Qué son las habilidades de IA?

Una habilidad de IA es un conjunto de instrucciones reutilizables que enseña a un modelo de IA a realizar una tarea concreta. Sigue el formato abierto Agent Skills: un archivo SKILL.md con un nombre y una descripción, además de los scripts, plantillas o archivos de referencia que pueda necesitar el modelo. El modelo solo lee las instrucciones cuando tu solicitud se corresponde con la habilidad, por lo que una habilidad instalada no supone ningún coste hasta que se utiliza.

¿En qué se diferencian las habilidades de IA de los plugins o los servidores MCP?

Un plugin o un servidor MCP proporciona al modelo nuevas herramientas que puede invocar: código que se ejecuta en algún lugar y devuelve un resultado. En cambio, una habilidad de IA aporta conocimientos y procedimientos al modelo: cómo abordar una tarea, qué pasos seguir y qué se considera un buen resultado. Las habilidades son instrucciones en Markdown, por lo que no necesitan servidor, clave API ni entorno de ejecución, y funcionan con cualquier modelo.

Ver todos

Crea ya tu propio espacio de trabajo IA

Suscríbete a nuestro boletín para recibir avisos sobre nuevas funciones y próximos sorteos 👇